1. Preliminaries

– Project Management.
– Site Management.
– Rubbish Removal.
– Floor Protection.

2. Demolition

– Install floor protection from the front door to the wet area.
– Install dust protection zipper door to bathroom.
– Position dust extraction fan and run vent outside window.
– Position Skip bin.
– Disconnection/removal of fixtures and fittings.
– Removal of all tiles and cement screeds.

3. Plumbing

– Alterations to water services to suit new fixtures.
– Allowance to alter drains under floor to suit new fixtures.
– Allowance to fit off fixtures.
– Installation of pressure device to ensure your property is protected.

4. Electrical

– Electrical Disconnect / Make Safe / Relocate / Rough-in Bathroom.
– Install only of 1 x LED downlight over Basin
– Supply & Install 1 x IXL bathroom heater.
– Supply and install LED Mirror over vanity.
– Supply and install LED lighting through out Niches, under vanity.
– Supply & Install 150mm ducting kit for bathroom heater to external eave.
– Supply & Install 1 x double GPO over vanity.
– Supply & Install light switch.
– Underfloor heating.

5. Carpentry Works

– Supply and installation of recessed niche box framing for shower and the bath
– Block out for accessory supports inside framework.
– Install architraves/trims around windows and doors.
– Allowance to trim down existing door to new tile height.

6. Plastering

– Install wall linings where plumbing and electrical alterations were done.
– Install acoustic insulation inside walls
– Install Cornice around bathroom.
– Set, sand joins.

7. Waterproofing

– Apply 2 coats of waterproof membrane inside the wet area.
– Install waterproofing floor angles to shower and entry way to wet area.
– Provide certificate for waterproofing upon completion.

8. Tiling

– Install cement screed
– Install floor tiles 300 x 300mm
– Install wall tiles 600 x 300mm
– Install feature wall
– Supply and install trims to windows and niche
– Grout/silicone bathroom
– Install floor waste drain and shower drain.
– Supply and installation of self-leveling tile clips (floor to ceiling Layout)

9. Glazing

– Supply and installation of complete frameless shower screen.

10. Painting

– Apply paint/primer to ceiling, door, window trims/architraves inside the wet area.

11. Cleaning

– D,P&B will conduct a final clean of the wet area.

Bathroom Cost before GST between $25,000 - $35,000